Jackhammering
Crew member is jackhammering the perimeter of the basement floor for The WaterGuard Sub-Floor Drainage System Installation.
Trench
After all jackhammered debris is removed and put into buckets.
TripleSafe Sump Pump
The sump pump is placed along side the WaterGuard. Water that drains through the system will be carried to the TripleSafe. The water is then carefully removed from the home by pumping through the Exterior Discharge Line, and safely carried away.
WaterGuard Placement
The WaterGuard is ready to be concealed with concrete!
Concrete layed over WaterGuard System
This is the final step after installing The WaterGuard System. Concrete is poured overtop leaving the WaterGuard Port open and accessible.